River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
  • Donate

Silverman Triathlon – Video Trailer

I found this on a fellow BLOG site on the Silverman Triathlon event. It is a documentary movie promotional.  The video trailer is by Momentum Advertising/Production www.newmomentum.com

When you get there turn up the volume and hit the full screen button.

http://vimeo.com/2310667

Silverman Triathlon bike-rider

Silverman Triathlon bike-rider

The “Three Sisters” a Biker’s Challenge…

Who or what are the Three Sisters?  They are three mountain ridges all in a row at the north end of the loop between mile marker #6.5 and #8.  These three were given their names by bike riders in the Annual Silverman Triathlon. There average grade is around 15% up & down. For the causal rider they offer good views of east Henderson and the Las Vegas valley.  We have looked at moving this segment into longer switch backs to reduce the grade, but the riders see it as a real challenge and goal to be able to make it over the top with out stopping.  This last year we had several riders come in to Aid Station #10 boasting that they had made the “Three Sisters.”  Some of the local riders also refer to them as the “Three Bitches”, but we prefer sisters.

Middle Sister courtesy of Furman

Middle Sister courtesy of Furman

Silverman Triathlon Gallery Three sisters etc>.

SILVERMAN TRIATHLON AID STATION #10 Successful

Silverman Aid Station #10 November 9th, 2008 – We staffed the station from 8:00 a.m. to 5:00 p.m.  Our theme was patriotic with red, white and blue in colors. We played patriotic music and had bells, horns, whistles for noise makers. We had a food station for our volunteers with extra snacks, hot dogs, and chili. We were very popular with the HPD ATV & motorcycle patrols through out the day.  Even though the weather was horrible, everyone had a good time and enjoyed the athletes through out the day. 

Silverman Aid Station #10

Silverman Aid Station #10

  • Saw our first rider around 11:00 a.m. and our last rider about 4:30 p.m. 
  • Our peak period was steady from 12:30 p.m. to around 3:00 p.m.
  • Our later riders had more needs upon arrival at the aid station ( rest room, food, salt, first aid etc). 
  • Had one rider late in day cash in and call for pick up…had chills and was cold, Henderson para-medics cared for his needs as they were on station.
  • Had 25-volunteers sign up for aid station; and had 20 volunteers show up; plus a few drop-ins from area who didn’t sign in.
  • Overall the event gets better each year. The number of athletes who told us thanks and that we were appreciated certainly made our day. 

    You can count on the River Mountains Trail Partnership for next years event and aid station support.
    Lady Liberty Jason & Jim themed colors 2008

    Lady Liberty Jason & Jim themed colors 2008

     

    Silverman Aid Station #10 – RMLT sponsors

    Less than two weeks Silverman Triathlon event on Nov. 9th.  We are busy planning and recruiting volunteers to man the aid station. This will be the fourth year the RMLT has sponored this aid station. Aid Station #10 is the last aid station on the bike course, we are located at 101-miles out of the total 112 mile race.  We play a critical role is serving the racers, refreshing them, and seeing to their continued safety. Our aid station site is at the corner of Old Vegas Trail and Paradise Hills Parkway, also known as Foothills Drive.

    We encourage anyone interested in supporting the racers to stop by and cheer them on.  In this race a finish is a victory to most of the racers.

    Aid station #10 will be open from 8:00 a.m. to 5:00 p.m. on race day.

    4th Annual Nevada Silverman Triathlon on Sunday, November 9, 2008

     Note from me: Silverman Triathlon runs a 9-mile portion of the 112-mile road race on the River Mountains Loop Trail. Three hills in this section have become known as the “Three Sisters” with grades approaching 15%.  See Frank Lowery’s news release about the 2008 race date below.

    The Nevada Silverman Triathlon Opens Registration for 2008 Rac
    HENDERSON, Nev. – November 15, 2007 – Frank Lowery, of Lowery’s Multisport Races announced today the City of Henderson and Christensen International Law will host the 4th annual Nevada Silverman Triathlon on Sunday, November 9, 2008. Registration for the full and half triathlons is now open. 
    Featuring a 2.4 mile swim in Lake Mead, a 112 mile bike ride and a 26.2 mile run that boasts a 2,000 foot elevation gain, the Silverman Triathlon is gaining attention across the globe. With more than 500 participants in the 2007 race, numbers are expected to almost double in 2008. “We are very excited to announce that the Nevada Silverman Triathlon will continue in 2008,” said Lowery. “Our registration for the 2008 race is up and running, we are excited to see the caliber of athletes that we are sure to attract next year.”About the Nevada Silverman Triathlon:
    The Silverman Triathlon is a full-distance triathlon held in Henderson, Nevada. Branded as the toughest course in North America by “The Man” himself, Dave Scott, and echoed by the finishers from 2005 and 2006, the Nevada Silverman is sure to attract individuals and relay teams from around the world in 2007.

    For registration or more information on the Nevada Silverman Full Distance Triathlon please visit www.silvermannv.com. 
     

    Recent Blog Posts

    Dogs on the Trail

    Las Vegas Hiking Trail Featured in Article

    Las Vegas Hiking Trail Featured in Article

    Pacifica trail head Boulder City on the new trail website.

    New Trail Website

    Be Sure to Visit

    Latest Posts on Facebook

    Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
    Author Avatar
    River Mountains Loop Trail
    2 months ago

    We are EXTREMELY short on survey responses for statewide outdoor recreation needs!

    Please click the link below to take the Statewide Comprehensive Outdoor Recreation Plan (SCORP) survey (about 5-7 minutes). The SCORP is a 10-year plan that establishes priorities to address unmet needs for public outdoor recreation land throughout the state. This is vital information for continued funding and outdoor recreation access in Nevada!

    ... See MoreSee Less

    Link thumbnail

    2027-2036 Nevada Statewide Comprehensive Outdoor Recreation Plan (SCORP) | State Parks

    parks.nv.gov

    Find your next adventure at parks.nv.gov
    View on Facebook
    · Share
    Share on Facebook Share on Twitter Share on Linked In Share by Email
    View Comments likes 2 Shares: 1 Comments: 0

    0 CommentsComment on Facebook

    Author Avatar
    River Mountains Loop Trail
    6 months ago
    The River Mountains

    The River Mountains Loop Trail detour will begin 8/4/25 and last for 30 days to install waterline adjacent to the RMLT between reservoirs R7 &R12 (approx. 2,500 feet) along with two trail crossings. The waterline trench is within a few feet of the edge of trail and would pose a hazard to the trail traffic being in close proximity to the open trench and equipment. Several options were considered by the City of Henderson, and the attached detour was selected as the safest and easiest physically option to the public while keeping the trail functional and on similar pavement. ... See MoreSee Less

    View on Facebook
    · Share
    Share on Facebook Share on Twitter Share on Linked In Share by Email
    View Comments likes wow angry 15 Shares: 5 Comments: 11

    11 CommentsComment on Facebook

    Author Avatar
    River Mountains Loop Trail
    6 months ago
    RMLT DETOUR! The Lak

    RMLT DETOUR! The Lakemoor development will be doing work in the near future that affects the trail. Attached is the detour route that has been approved. The work is anticipated to be at least 2 months (60 days), and the work is anticipated to start on July 21, 2025. ... See MoreSee Less

    View on Facebook
    · Share
    Share on Facebook Share on Twitter Share on Linked In Share by Email
    View Comments likes wow angry 9 Shares: 0 Comments: 5

    5 CommentsComment on Facebook

    Load more

    View Full-Sized