Trail Segments 3 and 4 at 90% design. Seg. 5 Construction Started.

 

Dec. 8th- Update on trail design – We are now at 90% design. Switch backs and grade modifications have been made. NPS and Boulder City to meet in field to work out final design spec’s at NPS Warehouse at completion point.  We are looking for bid documents and bidding before end of January 2009.  As mention under my Road Apples page this segment will have the highpoint in the trail system at 2620 feet.  There is a break over point where you can see into Lake Mead Basin and Eldorado Valley all at the same time. More later….

UPDATED INFORMATION 10-09-08: At our last RMLT meeting we reviewed and discussed 70% design drawings for these last two segments of trail through Boulder City. WE ask that additional switchbacks be looked at and installed to reduce trail slope and increase trail user enjoyment and views.  During September construction started on segment #5. Contractor will develop trail from Veteran’s home west to Railroad Pass. This segment will have a 100-ft. + bridge span installed. Looking for completion late spring 2009. Stay tuned for more trail updates.

_______________________________

May 29th 2008 – I just learned that the additional funding requested from SNPLMA SAR’S to expand the scope of work for trail segments 3,4 & 5 in Boulder City has been approved. This means the long awaited trail connection to Boulder City from Henderson will get started yet this summer.

It’s a long long story but segment #5, the key link from Henderson to Boulder City, has been delayed for serveral years. Permits, design issues, railroad crossings, etc. etc. The last delay was all the bids came in too high.  Several funding sources were investigated, but no additional funds were available.  A project team or task force was assembled lead by Jim Holland, NPS; Bill Martin, BOR; and Gary Zupanic, Boulder City; to bring all the right players to the table. A meeting was held in Boulder City City Hall on April 3rd to map out a course of action.  I’ll spare you all the additional details, but let it be known thSegment #5 trail head Railroad Pass Hotel & Casinoat the team effort put forth by all these folks will result in Boulder City being able to complete Segment #5** late Fall 2008, instead of the delayed alternative of Fall 2009.  We also need to thank the low bid contractor for holding his price until the additional funding was located. I can’t wait for opening of this segment as my first trip will be a bike ride to Milos Cellar in Boulder City for lunch and very cold “Fat Tire”.  Please join me….:) http://www.miloswinebar.com/content  

**Segment #5 – This segment of trail begins at the trail head located at Railroad Pass Hotel & Casino upper parking lot (photo to right) and heads south and east to Boulder City following the Boulder City Historic Railroad. The trail crosses the railroad tracks just before Cascata Drive. The trail then crosses over Cascata Drive on a long span pedestrian bridge. Trail continues east following the SNWA waterline to Boulder City linking up with one of the Bootleg Canyon trailheads just west of the B.C. Veteran’s home on Veterans Drive. 

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Author Avatar
River Mountains Loop Trail
1 month ago
Come and join us on

Come and join us on March 14th! ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 3 Shares: 0 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
1 month ago
Love our trail!

Love our trail!🎙️ New Podcast Episode Alert 🚨

Ever wondered what it takes to maintain 34 miles of paved paradise? 🌵

In this episode of The Best Dam Podcast, Howard is joined by Paul Grube, President of the River Mountains Loop Trail Partnership. Paul takes us behind the scenes of one of Southern Nevada’s most beloved outdoor assets—the River Mountains Loop Trail.

www.bouldercitychamber.com/connecting-communities-34-miles-of-cycling-hiking-and-history-on-the-r...

From its "happy hour" beginnings in the late '90s to becoming a world-class 34-mile loop connecting Boulder City, Henderson, and Lake Mead, this trail is a testament to community vision.

Highlights include:

🐢 The funny story of the "moving rock" (spoiler: it was a tortoise!).
🐑 Tips for spotting bighorn sheep and other local wildlife.
🛠️ How the Partnership acts as the "eyes and ears" to keep the trail safe.
🚲 Why you don’t even need your own bike to get started.

Whether you’re a hardcore cyclist or just love a morning stroll, you won’t want to miss Paul’s insights on this local treasure! ☀️
... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes love 6 Shares: 1 Comments: 3

3 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
2 months ago

FYI... For those who ride and hike Historic railroad trail....

... See MoreSee Less

Link thumbnail

Grant for erosion repairs will improve Historic Railroad Trail at Lake Mead

www.msn.com

A $250,000 grant from the James M. Cox Foundation, the charitable arm of Cox Enterprises, will support erosion repairs for the Historic Railroad Trail near Lake Mead.
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 11 Shares: 0 Comments: 0

0 CommentsComment on Facebook

Load more

View Full-Sized