![Hoover Dam trail up DCP 2004 Hoover Dam trail up DCP 2004](https://rivermountainstrail.org/wp-content/uploads/2009/11/hoover-dam-trail-up-dcp-20041.jpg?w=300)
Hoover Dam connector trail canyon wall 2004
Nov. 6, 2009 -  I ran across these old photos of the building of the connecting trail from the Historic Railroad down to the Hoover Dam Visitor center parking garage. This was probably one of the most expensive trail segments due to the NEPA and historic nature of the area; plus it had severe construction challenges. We had to hang a trail on the side of a canyon wall.
![Historic rail trail switch backs dam 6 Historic rail trail switch backs dam 6](https://rivermountainstrail.org/wp-content/uploads/2009/11/historic-rail-trail-switch-backs-dam-6.jpg?w=300)
Hoover connector trail - contractor & trail partners 2004
 The River Mountains Trail Partnership was activily involved in the completion of the Historic Railroad Trail including the Hoover Dam connector as it would become a landmark and historic destination on the whole trail system.
![Hoover Dam trail down DCP Hoover Dam trail down DCP](https://rivermountainstrail.org/wp-content/uploads/2009/11/hoover-dam-trail-down-dcp.jpg?w=300)
Hoover Dam connector trail switchbacks down canyon wall to garage...2004
The completion of the Historic Railroad Trail and the Hoover Dam connector trail were dedicated and open to the public in October 2007 with a bike ride from Boulder City to the Hoover Dam. The trail section from tunnel #5 to the dam is only open during daylight hours.Â
In the gallery photos below is one old B & W photo from Bureau of Reclamation public file photos showing the Hi-mix concrete plant with a steam locatmotive. This is the same location of the current Hoover Dam Connector Trail. If you look closely you’ll see the same large crack in the rock formation on the left.
Hoover Dam Connector Trail photo Gallery:
Â