River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
  • Donate

“End of the Trail” Planning Committee Formed

August 24, 2009 – The title is correct the “End of the Trail” building is in sight.  After eleven years and soon to be twelve years of planning, design, funding and construction the River Mountains Loop Trail will be complete.  All 34.5 +/- miles of it.  The partnership has established a committee to plan the “End of The Trail” event.  We want to share the trail experience with everyone in Las Vegas;  in Nevada; and in the good ole’ USA….so we are planning a party on the trail.  There will be trail rides, hikes, walks, bike rides, runs, crawls, jogs, marathons, bady buggie walks, 5-k & 10-k events, trail booths, speeches, awards, entertainment, food and drink etc. etc.

 WHERE: Current plans call for the upper parking lot and trail head at Railroad Pass Hotel & Casino.We held a National Trails Day event here in 2005 and it worked out really well. The location is on the River Mountains Loop Trail which allows for on trail activities to begin and end or conlcude at this location.
End of The Trail logo -Indian

End of The Trail logo -Indian

 

 

 

WHEN: We are planning around October 9th, 2010  – (13-months  &  2-weeks from now.)Why so far out? First we have to allow enough time to finish the last section of trail; secondly it will take some time to pull all the VIP’s together, and arrange enough sponsors. Thirdly, we have decided to hold the event in partnership with Henderson’s Annual celebration of National Trails Day in 2010.

TIME:  TBD …some events like a full 34.5-mile bike ride will start early; other events will have staggered start times depending on length  and distance; the exhibits, booth and food service will most like start mid-morning and remain open until speeches and awards are concluded around 1:00 p.m. when the party really starts….

 IS THIS THE END OF THE TRAIL FOR THE TRAIL PARTNERSHIP?  No..No… there is still much to do.  The partner agencies already have enhancement and safety projects in planning to make the trail a safer outing plus enhance the educational experience.  We are also looking for additional connectivity opportunities and have had discussions about possibly  developing secondary trails.

“End of The Trail” Logo– The world famous sculpture done by James Earle Frasier for the 1915 Panama-Pacific International Exposition in San Francisco,Ca. has many meaning to very one who observes it.  It turns out that Frasier did not have an interpretation of his own.  I’ve choosen the famous statue to represent the long trail we have come as a partnership and the humble experience we have all shared to see it through to completion.  What does the statue mean to you?? 

« National Trails Day Celebration – October 3, 2009 sponsored by Henderson Parks and Recreation Department
Hoover Dam Marathon Oct. 31, 2009 sponsored by Calico Racing »

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Author Avatar
River Mountains Loop Trail
2 weeks ago

Join us for a trail clean-up initiative at the Equestrian Park trailhead on River Mountain Trail in Henderson, on March 14, 2026. ♻️

More information is available by clicking the link below. 👇

The City of Henderson, responsible for maintaining over 300 miles of trails and 76 parks, relies on scheduled cleanups to ensure the protection of wildlife and community cleanliness. 🐢🐍🐏🦉
www.signupgenius.com/go/2026COHoutdoorrec#/ Equestrian Park trailhead @ River Mountain Trail City of Henderson Government Get Outdoors Nevada Green Valley Cyclists @topfans
... See MoreSee Less

Link thumbnail

2026 Spring Clean-up Opportunities

www.signupgenius.com

The City of Henderson has over 300 miles of trail and 76 parks. In Parks and Recreation department the Outdoor Recreation section is committed, to assisting in the maintenance of those trails. By sche...
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes love 9 Shares: 1 Comments: 1

1 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
2 months ago

We are EXTREMELY short on survey responses for statewide outdoor recreation needs!

Please click the link below to take the Statewide Comprehensive Outdoor Recreation Plan (SCORP) survey (about 5-7 minutes). The SCORP is a 10-year plan that establishes priorities to address unmet needs for public outdoor recreation land throughout the state. This is vital information for continued funding and outdoor recreation access in Nevada!

... See MoreSee Less

Link thumbnail

2027-2036 Nevada Statewide Comprehensive Outdoor Recreation Plan (SCORP) | State Parks

parks.nv.gov

Find your next adventure at parks.nv.gov
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 2 Shares: 1 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
6 months ago
The River Mountains

The River Mountains Loop Trail detour will begin 8/4/25 and last for 30 days to install waterline adjacent to the RMLT between reservoirs R7 &R12 (approx. 2,500 feet) along with two trail crossings. The waterline trench is within a few feet of the edge of trail and would pose a hazard to the trail traffic being in close proximity to the open trench and equipment. Several options were considered by the City of Henderson, and the attached detour was selected as the safest and easiest physically option to the public while keeping the trail functional and on similar pavement. ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes wow angry 15 Shares: 5 Comments: 9

9 CommentsComment on Facebook

Load more

View Full-Sized