River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
  • Donate

Trail Trash in the Bag March 21st

Trail Clean up March 2009

Trail Clean up March 2009

March 26, 2009 -  Saturday morning March 21st was a clear warm pleasant spring day. Some hundred plus volunteers showed up at Equestrain Park for what has become an annual River Mountains Loop Trail clean up.  The group split up into three groups and cleaned three different areas along the trail. There was also a Boy Scout Troop/cub pack which worked within the Equestrain Park picking up trash.

I had volunteered to work in group#3 which went to a new area of trail at the City of Henderson – National Park Service boundary near Lake Las Vegas. The lands are actually managed by the Bureau of Reclamation.  This area was an old rock gravel pit/mining area, target shooting, illegal camping, etc. and has not been clean up in 10-yrs easy. 

We had a great group of 16 hard working people including 11 Navy recruits soon to ship off to boot camp. We probably covered the shortest distance of any group, but collected the most heavy duty trash.  We picked up buckets of glass, concrete, tires, railroad ties, car parts, mattresess, tree limbs, and much much more.

We really appreciate our trail volunteers.  THANKS A MILLION!!!!

« Snakes of the River Mountains
Arnie’s Resort to Resort Trek on the River Mountains Loop Trail. March 2009 »

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Author Avatar
River Mountains Loop Trail
1 week ago

Join us for a trail clean-up initiative at the Equestrian Park trailhead on River Mountain Trail in Henderson, on March 14, 2026. ♻️

More information is available by clicking the link below. 👇

The City of Henderson, responsible for maintaining over 300 miles of trails and 76 parks, relies on scheduled cleanups to ensure the protection of wildlife and community cleanliness. 🐢🐍🐏🦉
www.signupgenius.com/go/2026COHoutdoorrec#/ Equestrian Park trailhead @ River Mountain Trail City of Henderson Government Get Outdoors Nevada Green Valley Cyclists @topfans
... See MoreSee Less

Link thumbnail

2026 Spring Clean-up Opportunities

www.signupgenius.com

The City of Henderson has over 300 miles of trail and 76 parks. In Parks and Recreation department the Outdoor Recreation section is committed, to assisting in the maintenance of those trails. By sche...
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes love 9 Shares: 1 Comments: 1

1 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
2 months ago

We are EXTREMELY short on survey responses for statewide outdoor recreation needs!

Please click the link below to take the Statewide Comprehensive Outdoor Recreation Plan (SCORP) survey (about 5-7 minutes). The SCORP is a 10-year plan that establishes priorities to address unmet needs for public outdoor recreation land throughout the state. This is vital information for continued funding and outdoor recreation access in Nevada!

... See MoreSee Less

Link thumbnail

2027-2036 Nevada Statewide Comprehensive Outdoor Recreation Plan (SCORP) | State Parks

parks.nv.gov

Find your next adventure at parks.nv.gov
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 2 Shares: 1 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
6 months ago
The River Mountains

The River Mountains Loop Trail detour will begin 8/4/25 and last for 30 days to install waterline adjacent to the RMLT between reservoirs R7 &R12 (approx. 2,500 feet) along with two trail crossings. The waterline trench is within a few feet of the edge of trail and would pose a hazard to the trail traffic being in close proximity to the open trench and equipment. Several options were considered by the City of Henderson, and the attached detour was selected as the safest and easiest physically option to the public while keeping the trail functional and on similar pavement. ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes wow angry 15 Shares: 5 Comments: 9

9 CommentsComment on Facebook

Load more

View Full-Sized