River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
  • Donate

The Hoover Dam Connection

John & Bill ride tru tunnel #5

John & Bill end of tunnel #5 just opened Oct. 19th, 2008

Hoover Dam connection

Debra & Barbara Hoover Dam visitor center link 10/19/07

The River Mountains Loop Trail is all about connections. Not who you know, but trail connections. I like to think of the RMLT as a hub in a bike wheel, only this hub is 34-miles around. A bike wheel has many many spokes and the RMLT has many trail connections going other places.  My favorite connection is to Hoover Dam via the Historic Railroad Trail.  This is a landmark trail connection one worthy of national recognition.

The Historic Railroad Trail follows the railroad bed used by the Sixes Company in the 1930’s to build Hoover Dam. Actually 3.5-miles of the River Mountains Loop Trail from Boulder City downhill to the Alan Bible Visitor Center also follows the old railroad grade providing great views of Lake Mead and the Henemway drainage. The trail-head just below the visitor center serves as a trail-head for both the Historic Railroad Trail and the River Mountains Loop Trail. The Railroad trail is not paved, but composed of native material and the original roadbed from the railroad. It follows a very gentle grade east to Hoover Dam passing through five (5) large tunnels and providing fantastic views of our ever changing Lake Mead. The trail is just a little over 4-miles one-way to the Hoover Dam visitor parking garage.  The final connection to Hoover Dam was completed and dedicated in the fall 0f October  2007.

Extending the Historic Railroad Trail to the Dam has been in progress since the late 1990’s. The opening of tunnel #5 and securing the tunnel walls was a multi-year project. This was followed by a BOR project to build a trail into the canyon walls above the parking garage. Then construction of the Hoover Dam by-pass delayed construction of the piece connecting the tunnel #5 to the dam. Finally completed, we held a celebration on October 19, 2007 to dedicate and open for public use all of the Historic Railroad Trail. Today you can get on the RMLT in Boulder City or in Henderson near Lake Las Vegas and ride all the way to the Dam non-stop.  In fall of 2010 you could ride from anywhere in Henderson via the River Mountains Loop Trail to Hoover Dam.  Best “Dam Trail” connection in the Nation.

For more history on the Historic Rail Road Trail and River Mountains Loop Trail check out the page named “Lawler Junction“.

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Author Avatar
River Mountains Loop Trail
4 weeks ago

We are EXTREMELY short on survey responses for statewide outdoor recreation needs!

Please click the link below to take the Statewide Comprehensive Outdoor Recreation Plan (SCORP) survey (about 5-7 minutes). The SCORP is a 10-year plan that establishes priorities to address unmet needs for public outdoor recreation land throughout the state. This is vital information for continued funding and outdoor recreation access in Nevada!

... See MoreSee Less

Link thumbnail

2027-2036 Nevada Statewide Comprehensive Outdoor Recreation Plan (SCORP) | State Parks

parks.nv.gov

Find your next adventure at parks.nv.gov
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 2 Shares: 1 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
5 months ago
The River Mountains

The River Mountains Loop Trail detour will begin 8/4/25 and last for 30 days to install waterline adjacent to the RMLT between reservoirs R7 &R12 (approx. 2,500 feet) along with two trail crossings. The waterline trench is within a few feet of the edge of trail and would pose a hazard to the trail traffic being in close proximity to the open trench and equipment. Several options were considered by the City of Henderson, and the attached detour was selected as the safest and easiest physically option to the public while keeping the trail functional and on similar pavement. ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes wow angry 15 Shares: 5 Comments: 11

11 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
6 months ago
RMLT DETOUR! The Lak

RMLT DETOUR! The Lakemoor development will be doing work in the near future that affects the trail. Attached is the detour route that has been approved. The work is anticipated to be at least 2 months (60 days), and the work is anticipated to start on July 21, 2025. ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes wow angry 9 Shares: 0 Comments: 5

5 CommentsComment on Facebook

Load more

View Full-Sized