River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
You are here: Home / hiking / Trail Alert – Historic Railroad Trail work finished Oct. 21, 2009

10/13/2009 by Editor

Trail Alert – Historic Railroad Trail work finished Oct. 21, 2009

October 22, 2009 – Historic Railroad trail is now open again to Hoover Dam.   Reclamation has improved the area that crosses the Police access road.  We have  striped a cross walk, and paved from the exit of the switchyard  to the top of the switchback trail down to the parking garage.

ADDITIONAL WORK PLANNED FOR 2010 – The Bureau of Reclamation Work planned for 2010:

  •  install 2 drinking fountains
  • Install 1 vault toilet
  • Install a shade shelter and table
  • Install benches along trail 
  • Correct  two dips to bring up to accessibility grade
  • open up the back trail loop,
  • and develop a trail map complete with lengths, elevations, GPS.

In my opinon these announced improvements will make this one of the best and most unique trail experiences in the Western States.  The back loop mentioned is more of the actual rail bed used to build the dam, which has been off limits to the public for years.  With completion of the bridge next year and these improvements the trail experience will just get better and better.

 

OCTOBER 13th, 2009 -Starting tonight about sundown a contractor will be ripping out the Hoover Dam Police road to repave it.   Reclamation would appreciate it if NPS and River Mountains partnership ask people to be careful in the area where the Historic Railroad trail crosses the roadway to the POLICE substation.

The contractor will be paving the trail from the switchyard exit bollards to the top of the Zig Zag trail, painting a cross walk across the police roadway, and paving the short term drop off and pick up area.

The trail will still be open dawn to dusk as the contractor is working nights, dusk to dawn on the project.  However, at times their will be some cones and tape to reroute the trail while they pave the trail areas.  This is a 2 week project and should be completed by October 23, 2009.

Reclamation will provide you updates as they become available.

 
 
 
 
 

 

Hoover Switch & Police station work area 2009

Hoover Switch & Police station work area 2009

(NOTE: This area is just before you enter the paved switch-backs down to the dam parking garage. Be safe and tell your friends.)

Filed Under: hiking, Trail Alerts, Trail conditions - Alerts - safety Tagged With: Historic Railroad Trail, Hoover Dam Trail, Nevada History, Trail work

« Big Horn Sheep near trail at risk?
Wildlife – Brown Tarantula on Trail Saturday »

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
River Mountains Loop Trail
3 weeks ago
River Mountains Loop Trail

Thanks to Stephanie Forte for writing this great piece for the Rails to Trails Conservancy about the RMLT!

www.railstotrails.org/trailblog/2023/may/05/nevada-s-river-mountains-loop-trail/
... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments
  • Likes: 16
  • Shares: 2
  • Comments: 1

Comment on Facebook

Yes, thank you Stephanie...

River Mountains Loop Trail
4 weeks ago
River Mountains Loop Trail

www.railstotrails.org/trailblog/2023/may/05/nevada-s-river-mountains-loop-trail
Great story about the River Mountains Loop Tral in the Rails To Trails Newsletter. Enjoy and feel free to share....
... See MoreSee Less

Link thumbnail

Nevada’s River Mountains Loop Trail | May 2023 Trail of the Month

www.railstotrails.org

A few miles into the 12-foot-wide trail, towering snowcapped Spring Mountains to the northwest dwarf the Vegas Strip’s cityscape. Since 2012, it’s...
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments
  • Likes: 22
  • Shares: 3
  • Comments: 0

Comment on Facebook

River Mountains Loop Trail
2 months ago
River Mountains Loop Trail
Work on the Boulder City railroad linear trail head. How exciting!!

Work on the Boulder City railroad linear trail head. How exciting!! ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments
  • Likes: 69
  • Shares: 3
  • Comments: 5

Comment on Facebook

Used to ride this all the time when I lived in Vegas🚴‍♀️🚴‍♀️

We rode the trail Sunday, May 7,2023. The entire loop. All 34 miles, no closures, No detours. It was a beautiful day on the trail!😎🚲☀️ There were so many riders, mostly on the Henderson side.

What are they building?

Is the construction completed?

Is the trail open now???

View more comments

Load more

View Full-Sized

A Project of Get Outdoors Nevada.

Copyright © 2023 · River Mountains Loop Trail · All rights reserved.

Return to top of page