River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
  • Donate

Trail Alert – Historic Railroad Trail work finished Oct. 21, 2009

October 22, 2009 – Historic Railroad trail is now open again to Hoover Dam.   Reclamation has improved the area that crosses the Police access road.  We have  striped a cross walk, and paved from the exit of the switchyard  to the top of the switchback trail down to the parking garage.

ADDITIONAL WORK PLANNED FOR 2010 – The Bureau of Reclamation Work planned for 2010:

  •  install 2 drinking fountains
  • Install 1 vault toilet
  • Install a shade shelter and table
  • Install benches along trail 
  • Correct  two dips to bring up to accessibility grade
  • open up the back trail loop,
  • and develop a trail map complete with lengths, elevations, GPS.

In my opinon these announced improvements will make this one of the best and most unique trail experiences in the Western States.  The back loop mentioned is more of the actual rail bed used to build the dam, which has been off limits to the public for years.  With completion of the bridge next year and these improvements the trail experience will just get better and better.

 

OCTOBER 13th, 2009 -Starting tonight about sundown a contractor will be ripping out the Hoover Dam Police road to repave it.   Reclamation would appreciate it if NPS and River Mountains partnership ask people to be careful in the area where the Historic Railroad trail crosses the roadway to the POLICE substation.

The contractor will be paving the trail from the switchyard exit bollards to the top of the Zig Zag trail, painting a cross walk across the police roadway, and paving the short term drop off and pick up area.

The trail will still be open dawn to dusk as the contractor is working nights, dusk to dawn on the project.  However, at times their will be some cones and tape to reroute the trail while they pave the trail areas.  This is a 2 week project and should be completed by October 23, 2009.

Reclamation will provide you updates as they become available.

 
 
 
 
 

 

Hoover Switch & Police station work area 2009

Hoover Switch & Police station work area 2009

(NOTE: This area is just before you enter the paved switch-backs down to the dam parking garage. Be safe and tell your friends.)

« Big Horn Sheep near trail at risk?
Wildlife – Brown Tarantula on Trail Saturday »

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Author Avatar
River Mountains Loop Trail
4 weeks ago

www.facebook.com/share/p/1Hz7o2W4xo/ ... See MoreSee Less

Link thumbnail

Register for a Smart Cycling Class | League of American Bicyclists

bikeleague.org

Post Title
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 0 Shares: 0 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
2 months ago
Come and join us on

Come and join us on March 14th! ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 3 Shares: 0 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
3 months ago
Love our trail!

Love our trail!🎙️ New Podcast Episode Alert 🚨

Ever wondered what it takes to maintain 34 miles of paved paradise? 🌵

In this episode of The Best Dam Podcast, Howard is joined by Paul Grube, President of the River Mountains Loop Trail Partnership. Paul takes us behind the scenes of one of Southern Nevada’s most beloved outdoor assets—the River Mountains Loop Trail.

www.bouldercitychamber.com/connecting-communities-34-miles-of-cycling-hiking-and-history-on-the-r...

From its "happy hour" beginnings in the late '90s to becoming a world-class 34-mile loop connecting Boulder City, Henderson, and Lake Mead, this trail is a testament to community vision.

Highlights include:

🐢 The funny story of the "moving rock" (spoiler: it was a tortoise!).
🐑 Tips for spotting bighorn sheep and other local wildlife.
🛠️ How the Partnership acts as the "eyes and ears" to keep the trail safe.
🚲 Why you don’t even need your own bike to get started.

Whether you’re a hardcore cyclist or just love a morning stroll, you won’t want to miss Paul’s insights on this local treasure! ☀️
... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes love 6 Shares: 1 Comments: 3

3 CommentsComment on Facebook

Load more

View Full-Sized