River Mountains Loop Trail

Facebook icon

  • Home
  • About
  • Trailheads and Maps
    • Trailheads in Boulder City
    • Trailheads in Henderson
    • Trailheads in Lake Mead NRA
  • History
    • Geology of the River Mountains
    • A -Desert Tortoise – Do’s & Dont’s
    • Keep It Clean
  • Blog
    • Recently on Facebook
  • Contact
    • Contact List
  • Donate

Interbike Demo – Bootleg Canyon- New Belgium-River Mountains Loop Trail Sept. 21 & 22 2009

Sept. 21 & 22 2009 -  For the first time the river mountains Trail Partnership participated in the Interbike Outdoor Demo held the 21st & 22nd in Boulder City.  Event was held in the Bootleg Canyon Park.  What impressed me as a first timer was the thousands of bike enthruist  riding every  type of bike you can imagine, and they were not running over each other.  Temps in the low 90’s and it was windy, thus we ate a lot of dust.

 

 Interbike Outdoor Demo 09-21-09

 

 The real highlight for us was the partnership with “NEW BELGIUM BREWERY’ and their “Team Wonderbike” program.  We shared a booth and distributed information about both the trail and the “Team Wonderbike” pledge; plus we helped sell New Belgium  “Fat Tire” t-shirts and hats. 

Link to: http://www.newbelgium.com/team-wonderbike    The pledge goes like this: “I pledge allegiance to my bike,  as a patriotic cure for America…and to the public, with whom we stand, one elation, undeniable….with community and transport for all…BIKE MORE…DRIVE LESS!”

 

 

Interbike & New Belgium & RMTP 092109

Interbike & New Belgium & RMTP 092109

 The RMTP also staffed a booth provided by Interbike at the Sands Expo for three days in the advocacy section. We were not in the main stream show floor. We did received a fair number of local retailers stopping by to learn more about the trail, sections complete and to pick up maps.  The Sands exhibits were absolutely mind bloggling for a first timer like me. I had no idea how big the biking industry is…

Interbike show Sands Expo- john, Tony & joyce working RMTP booth 92309

Interbike show Sands Expo- john, Tony & joyce working RMTP booth 92309

 Interbike Outdoor Gallery/New Belgium/RMTP booth:

« WARNING: Coyote Alert Along Trail Continues
Interbike Demo – Bootleg Canyon- New Belgium-River Mountains Loop Trail Sept. 21 & 22 2009 »

Recent Blog Posts

Dogs on the Trail

Las Vegas Hiking Trail Featured in Article

Las Vegas Hiking Trail Featured in Article

Pacifica trail head Boulder City on the new trail website.

New Trail Website

Be Sure to Visit

Latest Posts on Facebook

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Author Avatar
River Mountains Loop Trail
1 month ago

We are EXTREMELY short on survey responses for statewide outdoor recreation needs!

Please click the link below to take the Statewide Comprehensive Outdoor Recreation Plan (SCORP) survey (about 5-7 minutes). The SCORP is a 10-year plan that establishes priorities to address unmet needs for public outdoor recreation land throughout the state. This is vital information for continued funding and outdoor recreation access in Nevada!

... See MoreSee Less

Link thumbnail

2027-2036 Nevada Statewide Comprehensive Outdoor Recreation Plan (SCORP) | State Parks

parks.nv.gov

Find your next adventure at parks.nv.gov
View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes 2 Shares: 1 Comments: 0

0 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
5 months ago
The River Mountains

The River Mountains Loop Trail detour will begin 8/4/25 and last for 30 days to install waterline adjacent to the RMLT between reservoirs R7 &R12 (approx. 2,500 feet) along with two trail crossings. The waterline trench is within a few feet of the edge of trail and would pose a hazard to the trail traffic being in close proximity to the open trench and equipment. Several options were considered by the City of Henderson, and the attached detour was selected as the safest and easiest physically option to the public while keeping the trail functional and on similar pavement. ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes wow angry 15 Shares: 5 Comments: 11

11 CommentsComment on Facebook

Author Avatar
River Mountains Loop Trail
6 months ago
RMLT DETOUR! The Lak

RMLT DETOUR! The Lakemoor development will be doing work in the near future that affects the trail. Attached is the detour route that has been approved. The work is anticipated to be at least 2 months (60 days), and the work is anticipated to start on July 21, 2025. ... See MoreSee Less

View on Facebook
· Share
Share on Facebook Share on Twitter Share on Linked In Share by Email
View Comments likes wow angry 9 Shares: 0 Comments: 5

5 CommentsComment on Facebook

Load more

View Full-Sized